wholesaler-ops

v1.0.0 MIT real-estate updated 2026-09-27

Price a wholesale deal in one command — give it the after-repair value, repair estimate, and your desired assignment fee, and get the maximum allowable offer via the 70% rule with every line of math shown, plus the buyer's all-in cost and margin. Use when deciding what to offer a motivated seller or sanity-checking a deal's spread.

$ skillbank install wholesaler-ops@1.0.0
# pins exactly 1.0.0 · README + changelog included

Wholesaler Ops

Overview

A maximum-allowable-offer calculator for wholesalers. You supply the ARV (after-repair value), the repair estimate, and your desired assignment fee. The script applies the 70% rule — MAO = ARV × 0.70 − repairs − fee — prints every line of the calculation, and shows the assignment-fee math: what the cash buyer actually pays, your fee as a share of ARV, and the buyer's implied margin. All data stays local — nothing is uploaded.

Installation

1. Copy the wholesaler-ops/ directory anywhere convenient. 2. Make the script executable (Unix):


   chmod +x scripts/offer.py

No pip install needed — standard library only.

Configuration

No config file. Three required flags:

| Flag | Description | |-------------|----------------------------------------------------------| | --arv | After-repair value — what the fixed-up property sells for. | | --repairs | Estimated repair/renovation cost. | | --fee | Your desired assignment fee. |

Base ARV on sold comps (last 6 months, similar size/condition), not list prices. See references/seventy-percent-rule.md for how the rule works and where it breaks down.

Inputs

offer.py --arv N --repairs N --fee N

Returns, on stdout: the 70% ceiling, repair and fee deductions, the MAO, the cash buyer's price, your fee as % of ARV, and the buyer's all-in cost with implied margin. A negative MAO triggers a warning that the deal does not work at that fee. Invalid input produces a clear Error: message on stderr and exit code 2 — never a raw traceback.

Worked example

ARV $250,000, $40,000 in repairs, $15,000 assignment fee:


./scripts/offer.py --arv 250000 --repairs 40000 --fee 15000

Output:


Maximum allowable offer (70% rule)

  ARV                          $250,000.00
  x 70%                        $175,000.00
  - Repair estimate            $40,000.00
  - Assignment fee             $15,000.00
  = MAX ALLOWABLE OFFER        $120,000.00

  Assignment-fee math:
    Cash buyer pays MAO + fee  $135,000.00
    Your fee is 6.0% of ARV
    Buyer's all-in (fee + repairs) $175,000.00
    Buyer's implied margin     30.0% of ARV

Offer the seller $120,000 or less; the buyer pays $135,000 total to you and the seller, and their 30% spread covers profit, holding costs, and risk. If the seller won't take $120,000, walk away — don't raise the MAO.

Version history

Changelog

1.0.0 — 2026-09-27

  • Initial public release.
  • scripts/offer.py: ARV + repairs + assignment fee → maximum allowable offer via the 70% rule, with assignment-fee math (buyer price, fee % of ARV, buyer all-in and margin) and a negative-MAO warning.
  • references/seventy-percent-rule.md: how the 70% rule works, a worked mini-example, and six limits to read before trusting it.
  • Zero dependencies; tested with ARV $250k / repairs $40k / fee $15k, a negative-MAO edge case, and bad-input cases.

← back to catalog